Lowered by Stinker.

BriteCrawler

Full Access Member
Joined
Jan 6, 2007
Messages
664
Reaction score
0
Location
Kennesaw, GA.
The kit looks and drives great thus far guys.

Install was about 6 hours with 3 experienced guys. New endlinks and bushings from JMB went in at the same time. Steering is tight and responsive, ride is not bouncy, but tight - much more performance feeling than before.

I have not had a chance to get it on the highway yet.

A+ Product, A+++ Price and support from these two vendors as usual.

frontlow2.jpg


lowback.jpg


lowangle.jpg


...and a before reference picture...

truck527.jpg
 
sleeper said:
Why did it take so long? What is the drop in front and back?

This is the Git-R-Down "Stage 1" 1.25 / 2 drop.

It took 6 hours cause there was as much beer drinking as there was bolt turning. :rock: :rock:
 

Latest posts

Support Us

Become A Supporting Member Today!

Click Here For Details

Back
Top