Me and Pete got up early this morning and worked on the truck..... Didn't get everything planned done but still got some done....
1. Replaced air alt with powder coated alternator.
2. Installed 6k HIDS
3. Started Hurst Line loc
Still have to do....
1. Power slot rotors with EBC red stuff pads
2. rebuild calipers
3. finish installing line loc
1. Replaced air alt with powder coated alternator.
2. Installed 6k HIDS
3. Started Hurst Line loc
Still have to do....
1. Power slot rotors with EBC red stuff pads
2. rebuild calipers
3. finish installing line loc