Just a few little things to go ? ? ?
FSTJACK said:
Roy there is still a lot to do.
Front air suspension.
Mount front outboard dbl adjustable shocks + plumb air lines.
Install motor after assembly, all pieces are ready to go.
Plumb dry sump + mount tank.
Builld wiring loom for Motec M800, rewire chasis + body. Install RaceData data logger + build wire looms.
Plumb nitrous, build nitrous fuel system, wire nitrous programmer.
Plumb trans cooling lines and trans fan cooling circuits.
Mount fuel cell + build mounts for rear mounted Waterman 12.5 GPM mechanical pump, plumb fuel lines.
Remove everything under dash that doesn't need to be there.
Scale + set up chasis.
Hundreds of hours of chasis and engine tuning.
I have that, the Chevelle and the red truck going on at the same time, almost finished with the trailer.
All these are major builds, the Chevelle is also a total race car build. B/GS