We're in the last leg of the build now. There is probably about 20 hrs left of wiring and we're done. Then some break-in miles and off to the dyno. I can see why the majority of the big builds take so long. It's a meticulous and grueling process.
We cant wait any longerblackviper said:We're in the last leg of the build now. There is probably about 20 hrs left of wiring and we're done. Then some break-in miles and off to the dyno. I can see why the majority of the big builds take so long. It's a meticulous and grueling process.
blackviper said:We're in the last leg of the build now. There is probably about 20 hrs left of wiring and we're done. Then some break-in miles and off to the dyno. I can see why the majority of the big builds take so long. It's a meticulous and grueling process.
We cant wait any longer
blackviper said:I need to call the fabricator before I release his information. He needs to make some changes to the setup to make the install a bit easier. It does come with the brackets and skid plate.
blackviper said:Maybe next Sunday Dennis.
6pakattack said:Damn George,you guys are gonna make me waite a week ???:dontknow:
blackviper said:Thanks guys. It's really close, should be done in the next 30 days. Things left to do are: finsh the wiring, install gauges for the N2O, side exhaust, and custom traction bars. Unfortunately, Mickey (1qksrt) needs to shift gears and work on his truck in preparation of the standing mile run Oct. 11.
Are you meeting us down at MM1?