Yeah but finding the time between the f'in' snow is the hard part, heres my list if I can remember everything.....
Volant
ROE TB
Radiator hard pipe, snakeskin
Thermostat, 170*
Mid pipes;DONE
Stage2 PCM,B&G;DONE
Oil cooler lines
Mirrors and CF handle covers
Rear lowering blocks, JTSVP
POLY sway bar bushings
Intake powdercoating
Snakeskin dipped valve covers
Coil packs, wires and plugs
Polishing the wheels
GreenStuff pads front and rear
Shifter handle
Viper floor mats
BT Catch can
I think that's it, but a big list to get done by the 11th if this weather doesn't get better and a little warmer.
OH, hood liner removed, cleaned and reinstalled too...............